EnclaveForum.net: Buick Enclave Online Community banner
1 - 4 of 4 Posts
G

·
Discussion Starter · #1 ·
General Motors Corp. said Tuesday it will spend $63 million on a casting plant to produce cylinder heads for 3.6-liter, high-feature V-6 engines used in the GMC Acadia, Saturn Outlook and Buick Enclave models.

About 130 hourly employees at the Saginaw facility will be retained with the investment, the automaker said.

The investment will cover renovations at the GM Powertrain Saginaw Metal Casting Operations plant and installation of new equipment for a semi-permanent mold process that involves a water cooling procedure, GM said.

The Saginaw plant, GM's largest aluminum-producing facility, also produces engine blocks and cylinder heads used in V-6 and V-8 engines powering sport utility vehicles and trucks including the Chevrolet Trailblazer and GMC Sierra. It employs 924 hourly and 167 salaried workers and has an annual payroll of $100 million.

Construction is to begin in spring 2009 and be completed in January 2011.

Source: http://www.wilx.com/news/headlines/7516582.html
 

· Registered
Joined
·
1,417 Posts
admin said:
General Motors Corp. said Tuesday it will spend $63 million on a casting plant to produce cylinder heads for 3.6-liter, high-feature V-6 engines used in the GMC Acadia, Saturn Outlook and Buick Enclave models.

About 130 hourly employees at the Saginaw facility will be retained with the investment, the automaker said.

The investment will cover renovations at the GM Powertrain Saginaw Metal Casting Operations plant and installation of new equipment for a semi-permanent mold process that involves a water cooling procedure, GM said.

The Saginaw plant, GM's largest aluminum-producing facility, also produces engine blocks and cylinder heads used in V-6 and V-8 engines powering sport utility vehicles and trucks including the Chevrolet Trailblazer and GMC Sierra. It employs 924 hourly and 167 salaried workers and has an annual payroll of $100 million.

Construction is to begin in spring 2009 and be completed in January 2011.

Source: http://www.wilx.com/news/headlines/7516582.html
CONGRATS TO GM....IM REALLY EXCITED :blob:
 

· Registered
Joined
·
10 Posts
:angryfire:
GM To Spend Millions On Crossover Engine Plant, but they cant fix an easy fix on their web site!!!!

NOW if only they can get their web site fixed and stop ignoring us..............


sorry for the frustration however im so happy to see GM finnally get things right.....but I try to register for the event I cannot because of their web site///////



same here tried like 10 times with 5 dealerships and was not able to sign up....GM finnally gives me a reason to buy then cannot get the web page corrected!!!! I emailed the GM web site 3 times with no answer...... do they realize some thing this small can change the minds of people who are 1st time GM buyers..................




this is what keeps popping up..............

Sorry, but there has been an error in the submission of your Enclave VIP Guest. Please use the back button to return to your form.

Back



Application Error: BUB0ABCE4
- Sorry, this promotion does not exist in the database. :angryfire:
 

· Registered
Joined
·
1,417 Posts
WELL, AT LEAST YOU GET THAT.... I GET NOTHING AT ALL :mad:
 
1 - 4 of 4 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top